Tiered Accountability Meetings

The daily and weekly meeting system that connects the frontline to the site. Problems are raised at the level closest to the work. What cannot be solved there moves up, the same day, with a named owner.

The meetings that make everything else possible.


Most organisations have too many meetings and not enough decisions. The same problems appear week after week. Actions are raised and not closed. The people closest to the work stop raising things because nothing moves.

Tiered Accountability Meetings are not more meetings. They are a different kind of meeting, short, structured, and connected. Each tier reviews what it needs to review, resolves what it can, and passes up what it cannot. The tier above removes what the tier below cannot remove. That is the whole system.

Done well, a problem raised at the line at 7am has a named owner and a close-out date before 10am. Done poorly, it is still on a list at the end of the week, if recorded at all.


What Tiered Accountability Meetings are

A tiered meeting system is a structured daily and weekly cadence that connects the levels of the organisation into a single information and decision flow. Each tier has a defined purpose, a defined agenda, a defined duration, and a defined escalation path. The tiers are interlocked: what cannot be resolved at one level moves to the next. Nothing sits without an owner.

The number of tiers depends on the size and structure of your organisation. A small single-function team may need two. A large multi-line manufacturing site typically needs four. The principle is the same at any scale: the meeting closest to the work is Tier 1. Each tier above it exists to support the one below.

ℹ️
More tiers is not better. The right number of tiers is the number that reflects the real decision-making levels in your organisation, the levels where a problem can actually be resolved or escalated. If two tiers in your structure have the same authority and the same information, they are one tier, not two.

This guide is in two parts. The first part explains what the system is, why each element matters, and how to design it for your site. The second part covers how to build it, step by step, with a clear output at each stage. If you are setting up the system for the first time, work through it in sequence. If you are reviewing a system that is already running, the audit standard in Step 7 is the most useful starting point.


The four-tier model below works well for a site with multiple production lines, a maintenance function, and a site leadership team. Use it as a starting point. Adjust the number of tiers, the names, and the attendees to reflect your actual structure.

TierWho attendsFrequencyDurationPrimary purpose
Tier 1Frontline team — operators, technicians, line leadsDaily — at shift start or handover10–15 minutesReview the shift plan, confirm the standard is in place, raise problems
Tier 2Department or area leader, frontline leadersDaily15–20 minutesReview Tier 1 outputs, resolve what Tier 1 could not, escalate what Tier 2 cannot
Tier 3Site or function leader, department leadersDaily or every other day20–30 minutesReview Tier 2 outputs, resolve cross-functional barriers, connect performance to strategic objectives
Tier 4Site leadership teamWeekly45–60 minutesReview the week, confirm strategic objectives are on track, set priorities for the week ahead
ℹ️
Tier 1 is the most important meeting in the system. It is where the work happens, where problems are first seen, and where the standard is either confirmed or not. Everything above it exists to support it.

Meeting design — consistent but not identical

All Tier 1 meetings across a site should follow the same format. Not because consistency is a goal in itself, but because a consistent format is what makes gaps visible.

If every Tier 1 meeting follows the same structure, same agenda sequence, same board layout, same action standard, then a leader attending any Tier 1 meeting anywhere on the site can immediately see what is working and what is not. They are not learning a new format. They are reading a familiar one. The gap stands out because everything around it looks the same.

A Tier 1 meeting in the maintenance department and a Tier 1 meeting on a production line will have different content. The safety issues are different. The hypercare processes are different. The performance measures are different. But the structure, safety first, yesterday's performance, today's plan, hypercare review, open actions, escalations, is the same. In that order. Every day.

The same principle applies to Tier 2 and Tier 3. Consistent format. Relevant content.

ℹ️
Consistency of format is not the same as uniformity of content. A maintenance Tier 1 reviews CIL completion, planned maintenance adherence, and work order status. A production Tier 1 reviews schedule adherence, quality, and changeover performance. The agenda items are the same. The measures behind them are different. That is the right balance.

How many tiers does your site or function need?

Start by asking how many real decision-making levels exist between the person doing the work and the person who sets the direction. Each level where a problem can be resolved, or must be escalated because it cannot be resolved there, is a tier.

Organisation typeTypical tiersNotes
Multi-line manufacturing site4The full model. Tier 1 at line level, Tier 2 at department or shift, Tier 3 at site operations, Tier 4 at site leadership
Single-line or small site2–3Tier 1 at line level, Tier 2 at site level. A third tier if there is a meaningful layer between them
Maintenance / Engineering3–4Mirrors the production structure. Tier 1 reviews work orders, CIL completion, and reactive maintenance
Planning / Supply Chain2–3Typically starts at Tier 2. May run a Tier 1 in larger planning functions with distinct sub-teams
Warehousing / Logistics2–3Tier 1 at shift level. Connects to site Tier 2 or Tier 3
Support functions2HR, Finance, IT typically operate at two tiers, feeding into site Tier 3 or Tier 4

These are starting points, not rules. A planning function that runs three tiers because it has three genuine decision-making levels is right to do so. A manufacturing site that runs three tiers because the fourth adds no decision-making value is also right.

ℹ️
The test for whether a tier is needed: If a problem raised at the tier below is always resolved at this tier, or always passed straight through to the tier above, this tier is not adding a decision-making level. It is adding a delay. Redesign or remove it.
⚠️
The instinct when designing the system is to start with the tiers that are easiest to implement, usually the upper tiers, because those leaders are already meeting. Start with Tier 1. The system works from the bottom up, not the top down. An upper-tier meeting that is not connected to a functioning Tier 1 beneath it is a reporting meeting, not an accountability meeting.

Why the structure matters

The structure is not bureaucracy. Each element of it exists for a reason. Remove any one of them and the system degrades.

Short meetings at fixed times.

A meeting that runs long is a meeting that will eventually be skipped. A meeting at a variable time is a meeting that will eventually be missed. The discipline of a fixed time and a fixed duration is what makes the system reliable. The team knows when it happens. The leader knows what to prepare. The agenda does not drift.

At the board, not in a room.

Tier 1 and Tier 2 meetings happen at the visual management board, the place where performance is tracked, actions are recorded, and the standard is visible. Not in a meeting room. Not on a screen. At the board. The board is the agenda. The board is the record. If the board is not current, the meeting cannot run properly, and that is the first finding.

Information flows up, decisions flow down.

The frontline team raises what they see. The department leader resolves what they can and passes up what they cannot. The site leader removes what the department cannot. This is the only direction that works. A system where information flows down and decisions flow up is a system where the people closest to the work are waiting to be told what to do about what they already know.

Named owners and close-out dates, every time.

An action without an owner is a wish. An action without a close-out date is a wish with a label. Every action raised in a tiered meeting gets a named owner and a close-out date before the meeting ends. Not eventually. Before the meeting ends.

The default close-out date is tomorrow. Not next week. Not end of month. Tomorrow. If tomorrow is not achievable, the action needs to be broken into a smaller step that is.

Leaders attend the tier below, on a schedule.

The tiered meeting system is not just an information flow. It is a confirmation system. Senior leaders attending the tier below them, on a defined frequency, is how the organisation knows the system is working, not just running.

The Tier 3 lead attends Tier 2 meetings. The Tier 4 lead attends Tier 3, and occasionally Tier 2 and Tier 1. This is not oversight. It is process confirmation applied to the management system itself.

When a senior leader attends the tier below, they are asking three questions:

  • Are the right things being reviewed?
  • Are decisions being made at the right level, or are problems sitting without an owner?
  • Are gaps understood, and do actions have named owners with close-out dates that will be checked tomorrow?
ℹ️
Attending the tier below is part of Leader Standard Work. It should appear on the leader's LSW at a defined frequency, weekly for the tier immediately below, monthly for two tiers below. It is not an ad hoc visit. It is a scheduled confirmation.
⚠️
The most common failure in tiered meetings is not running them badly. It is running them without consequence. Problems are raised. Actions are recorded. Nobody checks whether they closed. The same actions appear next week. The team learns that raising a problem changes nothing. They stop raising things. The system is now producing the opposite of what it was designed to do.

Hypercare Processes — what gets reviewed every day

Not everything needs daily review. But some things do. These are the processes where a single day of drift can produce a loss that takes a week to recover from, or cannot be recovered at all.

These are often called hypercare processes. They sit at the centre of the Tier meeting agendas. They are reviewed every day, at every relevant tier, until the site is confident the standard is holding without daily oversight.

What qualifies as a hypercare process:

  • The consequence of missing the standard for one day is significant, a quality failure, a safety incident, a schedule gap, a compliance breach.
  • The process is new, recently changed, or known to be at risk of drifting.
  • The process is directly connected to the site's current strategic objectives.
ℹ️
Hypercare is not always permanent. There are some fixed processes that are vital to the ongoing management of the site or function. Additional processes move into hypercare when they need daily attention. It moves out when the standard is stable, the team is capable, and the management system is confirming it regularly. The goal is always to reduce the hypercare list, not to add to it indefinitely. Review the list monthly. Remove processes that have been green for thirty consecutive days and are confirmed by process confirmation.

Common hypercare processes in manufacturing:

🎯
Safety. Near-misses, incidents, unsafe conditions, and deviations from safety standards. Reviewed every day without exception. A safety issue that is not reviewed the same day it is raised is a signal that safety is not the priority the organisation says it is.
🎯
Quality and defect handling. Defects found, defects at risk, out-of-specification results, and customer complaints. Reviewed daily to confirm the defect is contained, the cause is understood, and the fix is in place. A defect that is not contained the same day it is found is a defect that is still being produced.
🎯
Schedule adherence. Whether the production plan was met, by line, by shift, by product. Not just the number. The reason for any gap and the action to recover it. A schedule gap that is not understood the same day it occurs is a gap that will recur.
🎯
Changeover adherence. Whether changeovers ran to the standard time and method. Deviations are reviewed the same day, not to assign blame, but to understand whether the standard is achievable and what is making it hard.
🎯
Cleaning, Inspection, and Lubrication (CIL). Whether the CIL tasks were completed to standard. Missed CIL tasks are a leading indicator of equipment failure. They are reviewed daily because the consequence of missing them is not visible until it is too late.
🎯
Centreline management. Whether critical process parameters, temperatures, pressures, speeds, guide settings, are within the defined control limits. Deviations are reviewed the same day. A centreline deviation that is not reviewed is a process running outside its standard, producing output of unknown quality.
🎯
Maintenance adherence. Whether planned maintenance tasks were completed on time and in full. Deviations are reviewed the same day.

How to build your tiered meeting system

Work through the following steps in order. Each step has a clear output. Do not move to the next step until you have it.

Step 1 — Define your tiers

Before you fix times or design agendas, establish how many tiers your site or function actually needs.

Work through these questions:

How many genuine decision-making levels exist between the frontline and the site or function leader? Each level where a problem can be resolved, or must be escalated because it cannot be resolved there, is a tier. If two levels have the same authority and the same information, they are one tier.

Where does the work happen? That is where Tier 1 is. Not where the leaders sit. Where the work happens.

What is the smallest number of tiers that connects the frontline to the top of the function? Start there. You can always add a tier if a genuine gap appears. It is much harder to remove one once it is established.

For most multi-line manufacturing sites, four tiers is the right answer. For a single-function support team, two is often enough. For a large planning or supply chain function, three is typical.

Capture at this step:

TierName for your site or functionWho attendsDecisions they can makeWhat they escalate
Tier 1
Tier 2
Tier 3
Tier 4 (if needed)

The "Decisions they can make" and "What they escalate" columns are deliberate. If you cannot fill those columns, the tier is not yet defined well enough to run.

⚠️
Do not design the tiers around the org chart. Design them around the decisions. The org chart shows reporting lines. The tiered meeting system shows decision-making levels. They are related but not the same.

Step 2 — Set the fixed points

Fix the time and location for each tier before you design the agenda. The time must be consistent — same time every day, every week. The location must be at or near the visual management board for Tier 1 and Tier 2.

The tiers must be sequenced so that information can flow upward in a single morning. A typical sequence for a four-tier manufacturing site:

  • Tier 1: 07:00–07:15
  • Tier 2: 07:20–07:40
  • Tier 3: 08:00–08:30
  • Tier 4: Weekly — Monday morning or as agreed
⚠️
Do not schedule a higher tier before the tier below it has finished. Each meeting depends on the output of the one beneath it. If they overlap, the system cannot function. Build in a gap, even ten minutes, between each tier.
TierDay(s)Start timeDurationLocation
Tier 1
Tier 2
Tier 3
Tier 4

Also agree the cross-tier attendance schedule:

Senior leaders attending lower-tier meetings is how the organisation confirms the system is working, not just running. This is process confirmation applied to the management system itself.

WhoAttendsFrequency
Tier 2 leadTier 1 meetingWeekly — at least one Tier 1 per week, rotating across lines or areas
Tier 3 leadTier 2 meetingWeekly — at least one Tier 2 per week
Tier 3 leadTier 1 meetingMonthly — at least one Tier 1 per month
Tier 4 leadTier 3 meetingWeekly — at least one Tier 3 per week
Tier 4 leadTier 2 meetingMonthly — at least one Tier 2 per month

These are minimums. A site that is new to the system needs more cross-tier attendance, not less. Reduce frequency only when the system is demonstrably stable. Cross-tier attendance is part of Leader Standard Work. Build it into your LSW schedule before the system goes live.

⚠️
Cross-tier attendance only works if the senior leader is there to observe and ask questions, not to run the meeting or redirect the agenda. The meeting belongs to the tier that owns it. The senior leader's job is to confirm it is working as designed, and to remove what is making it hard.

Step 3 — Design the agenda for each tier

Each tier has a standard agenda. The agenda does not change from day to day. What changes is the content, the numbers, the actions, the escalations. The structure is fixed.

Standard Tier 1 Agenda: The same format for every Tier 1 on the site:

#Agenda itemPurposeTimeStandard
1SafetyNear-misses, incidents, unsafe conditions, or safety actions due today2 minSafety is always first. Never skipped, even if the status is green. A green status is a status.
2Yesterday's performanceDid we meet the plan? If not, what was the gap and why?3 minThe gap must be understood — not just reported. "We don't know yet" is an escalation, not an answer.
3Today's planWhat is the plan for this shift or day? What might get in the way?3 minThe team leaves knowing what success looks like today and what the risks are.
4Hypercare process reviewStatus of each hypercare process — green, amber, or red — with yesterday's result3 minOne line per process. Green means the standard was met. Amber or red means an action is already assigned.
5Open actionsWhat closed yesterday? What is due today? What is at risk?2 minEvery open action has a named owner and a close-out date. Actions due today are confirmed.
6EscalationsWhat cannot be resolved here and needs to go to the next tier, today?2 minEscalations are named before the meeting ends. Not "we might need to escalate." Named, with an owner.

Total: 15 minutes maximum.

ℹ️
The agenda sequence is not arbitrary. Safety first because it is the highest consequence. Performance second because it sets the context for everything else. Hypercare third because these are the processes most at risk of drifting. Actions and escalations last because they are the output of the conversation, not the input to it. Changing the sequence changes what the meeting produces.

Standard Tier 2 Agenda:

#Agenda itemPurposeTime
1SafetyAny escalations from Tier 1 or new issues since the last meeting2 min
2Performance summaryTier 1 outputs — what is on track, what is not, and why5 min
3Hypercare process reviewCross-area view of hypercare status — any amber or red from Tier 15 min
4Open actionsWhat is due today? What closed? What is overdue?3 min
5Barriers to resolveWhat did Tier 1 escalate? Who owns it? By when?3 min
6EscalationsWhat cannot be resolved here — today?2 min

Total: 20 minutes maximum.

Standard Tier 3 Agenda:

#Agenda itemPurposeTime
1SafetySite-level safety status and any escalations from Tier 23 min
2Performance summarySite performance against plan and strategic objectives7 min
3Hypercare process reviewSite-level view of critical process status — trends and risks5 min
4Open actionsCross-functional actions — status, overdue items, and risk5 min
5Barriers to resolveWhat did Tier 2 escalate? Who owns it? By when?5 min
6EscalationsWhat needs the next tier's attention this week?5 min

Total: 30 minutes maximum.

Standard Tier 4 Agenda:

#Agenda itemPurposeTime
1SafetyWeek's safety performance and open actions5 min
2Week reviewPerformance against plan and strategic objectives — what happened and why15 min
3Hypercare reviewWhich processes are in hypercare? What is the trend? What is moving off the list?10 min
4Strategic objective progressAre we on track? What changes this week?15 min
5Priorities for the week aheadThe things that must happen this week — named owners10 min
6Open actionsCross-site actions — overdue items, escalations, and risk5 min

Total: 60 minutes maximum.


What the attending senior leader is confirming:

When a senior leader attends a lower-tier meeting, they are not there to add agenda items or answer questions. They are there to confirm four things:

What to confirmWhat good looks likeWhat a gap looks like
The right things are being reviewedThe agenda covers safety, performance, hypercare, and open actions — in that order, every dayItems are skipped because "there's nothing to report" or the agenda has drifted to discussion
Decisions are being made at the right levelProblems are resolved at the tier where they can be resolved. What cannot be resolved is escalated immediately — not heldProblems sit without an owner. The meeting ends without a decision or an escalation
Gaps are understoodWhen performance is off plan, the team can explain why — not just report the numberThe gap is reported but not understood. The same gap appears tomorrow with the same explanation
Actions have named owners and tomorrow's dateEvery action raised has one owner and a close-out date of tomorrow or sooner — unless a longer timeline is genuinely justifiedActions are assigned to "the team" or given a date of "end of week" or "next meeting"

After attending, the senior leader feeds back to the tier owner, not in the meeting, but in a brief conversation afterwards. The feedback is specific: what was working, what was not, and what one thing would make the meeting more effective.

ℹ️
This feedback conversation is coaching, not criticism. The question is always: what is making it hard to run this meeting well? Not: why was it not run well?

What makes any tier meeting easy to audit:

Because every meeting at the same tier follows the same format, a leader attending any meeting on the site can assess it against the same standard. The audit is not subjective. It is a format check followed by a content check.

Format checkContent check
Did the meeting start on time?Was safety reviewed first, even if the status was green?
Did it finish within the agreed time?Was yesterday's gap understood — not just reported?
Was the board current before it started?Did every hypercare process get a status?
Was the agenda followed in sequence?Did every open action have a named owner and a tomorrow close-out date?
Were escalations named before the meeting ended?Did the team leave knowing what success looks like today?

A leader who attends a meeting in an unfamiliar area can complete this check during the meeting itself. They do not need to know the content. They are reading the format.


Step 4 — Build the visual management board

The board is not a decoration. It is the agenda. Every item in the meeting has a place on the board. If it is not on the board, it is not in the meeting.

The board is organised into four columns. This structure is the same for every tier, every function, every site.

ColumnWhat it holds
TeamWho we are, what we are accountable for, our strategic objectives and current focus areas
PlanThe standard — what we are trying to achieve. Target volumes, schedules, hypercare process standards, and the measures we track
DoThe daily scorecard — what actually happened. Updated before every meeting. EHS, Quality, Service, Finance — in that order
Check / ActOpen actions, escalations, trend charts, and the response to gaps. This is where decisions are recorded and owners are named
ℹ️
The board tells the story of the management system. A visitor who has never been to the site should be able to stand at the board for five minutes and understand: what this team is trying to achieve, whether they are achieving it, what the current gaps are, and what is being done about them. If they cannot, the board is not working.
ℹ️
The board must be current before the meeting starts. Updating the board is not part of the meeting. It is preparation for the meeting. If the board is not current when the meeting starts, the meeting cannot run. That is the first standard to hold.

The daily scorecard

The daily scorecard sits in the Do column. It is the single document that makes the tiered meeting system work. It is not a report. It is a live record, updated every day, reviewed every day, visible to every tier.

Each row is one measure. Each column is one day. The result for each day is recorded as a number, a tick, or a cross, green if the standard was met, red if it was not. No commentary in the cell. The colour tells you the status. The meeting provides the explanation.

The scorecard is organised by area, Safety, Quality, Service, Finance, in that order. Safety and quality issues are reviewed before service and cost. Every day. Without exception.

Example content for a daily scorecard:

AreaMeasureFrequencyUnit
EHSRecordable incidentsDaily#
EHSNear-misses reportedDaily#
EHSSafety observations completedDaily#
QualityQuality incidentsDaily#
QualityOut-of-specification results / food safety alertsDaily#
QualityProduct holdsDaily#
ServiceTarget volume vs. actualDailyTons / units
ServiceSchedule adherenceDaily%
ServiceOn-time deliveryDaily%
FinanceMaterial varianceDaily or weeklyCurrency per ton
FinanceLabour varianceDaily or weekly% overtime

The specific measures depend on the site, the function, and the current strategic objectives. The structure, area, measure, frequency, unit, daily result, is fixed.

⚠️
Do not add measures to the scorecard because they are available. Add them because a deviation would trigger an action. If a red result on a measure produces no response, remove the measure. A scorecard full of red results that nobody acts on is worse than no scorecard, it normalises failure.

The action list

The action list is the running record of every open action across the site. It is not the same as the board's daily action strip. The board shows today's actions. The action list shows everything, open, closed, and overdue, across all functions and all tiers.

It is reviewed at the upper tiers. It is the document that makes cross-functional accountability visible.

Minimum content for a site action list:

FieldPurpose
Area / functionWhich part of the organisation owns this action
Action descriptionWhat needs to happen — specific enough that anyone can assess whether it is done
OwnerOne named person. Not a team. Not a function. One person.
Start dateWhen the action was raised
Due dateWhen it must be closed
StatusOpen / Closed / Overdue
Days openCalculated. A large number here is a signal.
Late flagYes / No — did it close by the due date?
CommentsWhat happened, what changed, what the next step is
⚠️
The "days open" column is the most honest number on the list. An action that has been open for forty days with no update is not being managed. It is being carried. Review any action open for more than seven days at the third tier. Review any action open for more than fourteen days at the top tier. If it cannot be closed, it needs to be escalated or broken into a smaller step that can.

Step 5 — Define your hypercare list

Before the first meeting runs, agree the hypercare list for your site or area. This is the list of processes that will be reviewed every day at the frontline and department tiers.

Use these criteria to decide what goes on the list:

  • A one-day deviation produces a significant loss, quality, safety, schedule, or compliance.
  • The process is new, recently changed, or known to be at risk.
  • The process is directly connected to a current strategic objective.
Hypercare processWhy it is on the listStandard / targetHow it is measuredWho updates the boardReview tier
⚠️
A hypercare list that never shrinks is a sign that the management system is not working. The goal is to move processes off the hypercare list as the standard stabilises, not to keep adding to it. Review the list monthly. Remove processes that have been green for thirty consecutive days and are confirmed by process confirmation.

Step 6 — Run the first meetings

Run the first meeting with the full team present. Walk through the agenda item by item. Do not skip sections because there is nothing to report, a green status is still a status. The team needs to know that the standard is being met, not just that it is not being missed.

After the first week, review how the meetings ran:

  • Did they start and finish on time?
  • Was the board current before the meeting started?
  • Were actions raised with named owners and close-out dates?
  • Were close-out dates set for tomorrow, not next week?
  • Were open actions from yesterday reviewed first?
  • Were escalations passed up the same day?
  • Did the tier above respond to escalations before the next meeting?
  • Did any senior leader attend a lower-tier meeting this week? What did they find?
ℹ️
The close-out date is the most reliable indicator of whether the system is working. If actions are consistently given dates of "end of week" or "next month," the system is producing lists, not decisions. The standard is tomorrow. If tomorrow is not achievable, the action needs to be broken into a smaller step that is.
⚠️
The most common problem in the first weeks is that the tier above does not respond to escalations. If a frontline team escalates a problem and hears nothing back, they will stop escalating. The tier above must close the loop — visibly, the same day — or the system will not hold.

Step 7 — Sustain and improve the system

The meeting system is itself a process. It needs a standard, an owner, and a regular review.

Monthly review — ask these questions:

QuestionWhat a good answer looks like
Are all tiers running at the right frequency?Yes — with evidence from the board or attendance record
Are meetings starting and finishing on time?Yes — consistently, not occasionally
Is the board current before each meeting?Yes — updated by the agreed owner before the meeting starts
Are actions closing by tomorrow — not next week?Yes — the default close-out date is the next day's meeting. Exceptions are documented and justified
Are escalations being responded to the same day?Yes — the tier above closes the loop before the next meeting
Is the hypercare list being reviewed and reduced?Yes — processes are moving off the list as standards stabilise
Are frontline teams still raising problems?Yes — the number of problems raised is stable or increasing
Are cross-tier attendance commitments being met?Yes — senior leaders are attending lower-tier meetings at the agreed frequency and feeding back to the tier owner
ℹ️
A reduction in problems raised is not a sign that things are improving. It is usually a sign that people have stopped raising things. Watch this number carefully. If it drops, find out why before assuming the system is working.

What a functioning system looks like — the evidence standard:

The monthly review is not a conversation about whether the meetings are happening. It is a check against observable evidence. For each domain, there is a guiding statement and a set of evidence criteria. If the evidence is not present, the element is not in place, regardless of what the attendance record shows.

DomainGuiding statementEvidence
Daily direction settingThere is daily direction setting at every relevant tier. Gaps in previous performance are addressed and countermeasures assigned.Board is current. Scorecard is updated daily. Actions have named owners. Gaps are understood — not just reported.
Safety daily managementSafety performance is reviewed daily and integrated into the meeting system.EHS rows on the scorecard are updated daily. Safety actions are on the action list with owners and due dates. Near-misses are reviewed the same day they are reported.
Quality daily managementQuality performance is reviewed daily and integrated into the meeting system.Quality rows on the scorecard are updated daily. Out-of-specification results and product holds are reviewed the same day. Containment actions are on the action list.
Service daily managementSchedule performance is reviewed daily. Gaps are understood and recovery actions are assigned.Service rows on the scorecard are updated daily. Schedule gaps have named owners. Recovery plans are visible on the board.
Finance daily managementMaterial and labour variances are reviewed at the appropriate frequency and connected to the action system.Finance rows on the scorecard are updated at the agreed frequency. Variances above threshold have named owners and actions.
ℹ️
The owner of each domain should be able to explain the process flow and how it applies to their site. If they cannot, the system is being run but not understood. Understanding is what makes it self-sustaining.

Capture at this step:

FieldYour answer
Review date
Tiers running as designedYes / No — which tiers are not?
Action close rate% of actions closed by due date this month
Escalation response rate% of escalations responded to the same day
Cross-tier attendance metYes / No — which commitments were missed?
Hypercare processes removed this monthWhich ones, and why
Problems raised at Tier 1 this monthNumber — is this stable, increasing, or decreasing?
Changes made to the systemWhat was adjusted and why

What this gives you

✅
A single information flow from the floor to the site. Problems are visible the same day they occur. Decisions are made at the right level. The people closest to the work know that raising a problem will produce a response, today, not next week.
✅
A daily confirmation that the standard is holding. The hypercare review at the frontline and department tiers is the daily check that the most critical processes are running correctly. It does not replace process confirmation, it complements it. Together they form the daily assurance system.
✅
A mechanism for sustained improvement. Every improvement eventually drifts without a system to hold it. The tiered meeting system is that system. It is the structure that makes improvement stick.

Leadership behaviours

The meeting system only works if the leaders who run it behave in a specific way. The structure creates the conditions. The behaviour is what makes it real.

  • Arrive prepared. The leader who walks into a Tier 1 meeting without having reviewed the board is not leading the meeting. They are attending it. Board review is preparation, not part of the meeting.
  • Ask about the process, not just the result. "Why did we miss the target?" is a result question. "What happened in the process that produced that result?" is a process question. The second question is the one that leads somewhere.
  • Act on what you find, in the room. A meeting that identifies a problem and assigns no owner has not solved anything. Every gap needs a named owner and a close-out date before the meeting ends. Not after. Before.
  • Escalate the same day. A problem that cannot be resolved at Tier 1 goes to Tier 2 today. Not at the end of the week. The speed of escalation is the speed of the system.
  • Close the loop visibly. When the tier above acts on an escalation, the tier below needs to know. A frontline team that escalates a problem and hears nothing back will stop escalating. Close the loop before the next meeting, at the board, where the team can see it.
  • Attend the tier below on a schedule. This is not optional and it is not micromanagement. It is the mechanism by which the system is confirmed to be working. When a senior leader attends the tier below, the team sees that the system matters. When they stop attending, the team draws the correct conclusion.

Common pitfalls

⚠️
Starting at the top. The upper tiers are easier to start because those leaders are already meeting. But an upper-tier meeting with no functioning frontline meeting beneath it is a reporting meeting. Start at Tier 1. Build upward.
⚠️
Too many tiers. More tiers is not a more complete system. It is a slower one. If a tier cannot point to decisions it makes that no other tier makes, it does not need to exist. Design around decisions, not structure.
⚠️
Meetings that run long. A Tier 1 that regularly runs to thirty minutes is not a Tier 1. It is a problem-solving session. Problem solving happens after the meeting, with the right people, using the right process. The meeting raises the problem and assigns an owner. It does not solve it.
⚠️
Actions with no tomorrow date. An action due "end of week" or "next month" will not be reviewed tomorrow. It will drift. The standard is tomorrow. Hold it.
⚠️
Escalations that go nowhere. If the tier above does not respond to escalations the same day, the tier below will stop escalating. The tier above must close the loop visibly, before the next meeting, or the system will not hold.
⚠️
A scorecard nobody acts on. A red result that produces no action is not a data point. It is a signal that the system has stopped working. If a measure is consistently red and consistently ignored, remove it or fix the response. Do not leave it red.
⚠️
Cross-tier attendance that becomes inspection. When a senior leader attends a lower-tier meeting and takes over the agenda, the tier owner stops owning it. The senior leader is there to observe and ask one question: what is making it hard to run this meeting well? Nothing more.

This guide depends on:

The tiered meetings are the fixed points that Leader Standard Work is built around. Cross-tier attendance belongs on every leader's LSW at a defined frequency.

This guide connects to:

What the tiered meetings find, Process Confirmation acts on, and vice versa. Process Confirmation is the structured check that feeds the meeting system with reliable information about whether standards are being followed.

The hypercare processes reviewed in the meeting system need defined standards to be confirmed against. Process improvement is how those standards are set and improved.